Project Description

Project Name:  Atakent 3rd Stage Mass Housing Management

Field Of Activity: Mass Housing

Employer: Atakent 3rd Stage Mass Housing Management

Location: Başakşehir/İstanbul

Operations: Installation of photocell door system.

The door models that are used: Evo 300 two movable wing door

Why Evo 100 Automatic Door System was chosen?:  Evo 300 Automatic Door System was preferred because it is ergonomic and advantageous in terms of price performance.

Project Time: 5 days

Discovery process: Free estimate was made. Draft measurements were taken and an offer was submitted. 1 Evo 300 automatic door system was installed.

Tıkla Ara