Project Description
Project Name: Atakent 3rd Stage Mass Housing Management
Field Of Activity: Mass Housing
Employer: Atakent 3rd Stage Mass Housing Management
Location: Başakşehir/İstanbul
Operations: Installation of photocell door system.
The door models that are used: Evo 300 two movable wing door
Why Evo 100 Automatic Door System was chosen?: Evo 300 Automatic Door System was preferred because it is ergonomic and advantageous in terms of price performance.
Project Time: 5 days
Discovery process: Free estimate was made. Draft measurements were taken and an offer was submitted. 1 Evo 300 automatic door system was installed.