Project Description
Project Name: Installation of Photocell Door System at TP Gas Station
Field Of Activity: Fuel Industry
Employer: TP Gas Station
Location: Küçükçekmece/İstanbul
Operations: Installation of Evo 100 single wing photocell door system.
The door models that are used: Evo 100
Why Evo 100 Automatic Door System was chosen?: Evo 100 Automatic Door System was preferred because it is ergonomic and advantageous in terms of price performance.
Project Time: 4 days
Discovery process: Before the project, a free estimate was made, and after the budget approval, 1 Evo 100 single wing automatic door system was installed immediately.